Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the download-manager domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/thecontroller/public_html/wp-includes/functions.php on line 6121
About Us – ARQ & Partners Consulting Engineers

Why we are so unique!

About Us

Find out about our roots

History

ARQ & Partners has a proud history in Oman through design activities carried out by Bartel Haupt, manager of ARQ & Partner, Astrid Aubry, Chief Technical Officer of ARQ & Partners and Dr. Quentin Shaw, one of the founding partners of ARQ Pty Ltd in South Africa. Mr. Haupt and Dr. Shaw first worked together in 1999 on the Third Lilongwe Water Supply Project that included the raising of Kamuzu Dam II by 5m. Wadi Dayqah dam is the largest dam in Oman and Dr. Shaw was responsible for the structural and materials design of the RCC dam, RCC specification of Wadi Dayqah dam project during construction. ARQ also aided the project contractor of Umti Dam, with contributions including all major construction method statements, plant and equipment design and specification and Hardfill mix design. ARQ was also requested by the designer and owner to simplify the dam design to accelerate the rate of construction. This goal was successfully achieved, despite the owner’s challenging requirements for an extremely high quality of finish and the original programme of 4,5 months for Hardfill placement was reduced to just 5 weeks.

The most recent flood protection dams designed by Bartel Haupt, while still employed
at Renardet, are the Wadi Jurf and Saay dams in Duqm. Astrid Aubry came to Oman
in 2014 and has concentrated on Geotechnical engineering with special emphasis of
the geotechnical engineering related to dam design. She was the principal design
engineer for Uyun groundwater recharge dam, with construction completed in 2019 as
well as the geotechnical designer of the Jurf and Saay Embankment damsin Duqm.